Ashraf MohamedFrontend Engineer

Portrait of Ashraf Mohamed in dramatic side light

Designing interfaces that move with purpose.

Scene 01

Interfacesas movingimages.

Every screen is a frame. I build them with the patience of a photographer and the discipline of an engineer.

Empty gallery hall crossed by beams of light
Work / 01
Analytics dashboard interface

A dense data surface made calm through hierarchy and restraint.

  • React
  • TypeScript
  • Design System
Work / 02

Seamless Across All Devices

Ordering reduced to a single confaident gesture.

Tablet analytics dashboard screen
Mobile ordering app screen
  • Next.js
  • Motion
  • Accessibility
Work / 03

Multilingual Web Application

Bilingual web application interface

One layout system, two reading directions, no compromise.

  • React
  • i18n / RTL
  • Tailwind CSS
Black and white close-up detail portrait
Portrait

Precisionis a formof care.

I'm a Frontend Engineer building responsive, scalable, accessible and visually refined digital products — the kind that feel considered long before anyone notices why.

Focus
Interfaces, motion, design systems
Tooling
React, Next.js, TypeScript
Styling
Tailwind CSS, SCSS
Care
Accessibility, performance, detail
Experience

Where I've worked

Full-time· 1 yr 9 mos

ElmoTech

  • Senior Frontend Developer2 mos
  • Frontend Developer1 yr 8 mos
Dec 2024 — PresentItaly · Hybrid

Promoted to Senior Frontend Developer after leading frontend delivery across ElmoTech's products.

  • Own the frontend architecture and the shared component system.
  • Ship React interfaces with motion and accessibility built in.
  • React.js
  • Front-End Development
  • TypeScript
  • Next.js
  • Tailwind CSS
  • Motion
  • Accessibility
  • Design Systems
Full-time· 3 mos

Masar Soft

  • Frontend Developer3 mos
Oct 2024 — Dec 2024Online · Remote

Reusable components and a shared frontend architecture.

  • Designed reusable components and frontend architecture shared across multiple product features.
  • Management
  • Sales
  • Frontend Architecture
Full-time· 7 mos

رموز الرقيمة

  • Frontend Developer7 mos
May 2024 — Nov 2024El Mansoura, Egypt · On-site

Scalable React interfaces, shipped with the team.

  • Built and maintained scalable web interfaces using React.js and Tailwind CSS.
  • Collaborated with designers, backend engineers and product stakeholders to deliver 5 projects.
  • Front-End Development
  • Frontend Coding
  • React.js
  • Tailwind CSS
Scroll

Disciplines & tools

  • React
  • Next.js
  • TypeScript
  • Responsive Interfaces
  • Frontend Architecture
  • Design Systems
  • Motion
  • Accessibility
  • React
  • Next.js
  • TypeScript
  • Responsive Interfaces
  • Frontend Architecture
  • Design Systems
  • Motion
  • Accessibility
Toolkit

Ready-madetools forbuilders.

Packages and reusable snippets I've built for real projects — starting points you can install and ship. Curated, categorised, no filler.

Open the toolkit